Interaction between pedestrians, cyclists and trams on Wilford Toll Bridge PDF 19 KB Minutes: Andy Holdstock, Senior Project Engineer, NET, presented his report providing the Committee with an update on the usage and safety of Wilford Toll Bridge since the introduction of trams. Andy highlighted the following:
(a)
since trams were introduced to the bridge, there have been no
complaints from pedestrians using the bridge, or the parents of
schoolchildren who use the bridge; (b) the tram drivers are trained to slow down when crossing the bridge and are vigilant for pedestrians using the shared space, particularly at peak times;
Committee members raised the following concerns:
(c)
the Head Teacher of St Patrick’s
Primary School has said that a number of parents have reported
problems on the bridge where the tram has had to brake suddenly.
The school has written a letter outlining its concerns and saying
that it believes the bridge still needs careful monitoring as
children are still not used to trams; (d)
there were similar concerns around safety for cyclists on
Chilwell Road, where they are not
following the assigned directions to go around the tram stop and
there have been several accidents; (e) as the Wilford Toll Bridge forms a part of the council’s planned southern cycle corridor there is likely to be an increase in the number of cyclists using the bridge so the situation should continue to be monitored;
The following responses were given in answer to questions raised by the Committee:
(f)
the letter from St Patrick’s
Primary School may have been sent to the wrong organisation. A
response should be forthcoming. The area will continue to be
monitored and an offer will be made to do a school visit to talk to
the children and do a safety assembly; (g)
Chilwell Road has always been one of
the most problematic areas for the tram due to lack of space and an
awkward compromise. A review is currently being carried out of all
tram stops where cyclists are encouraged to go behind the stops as
these may require additional signage. Tram drivers are all trained
for the worst and are prepared for cyclists; (h)
If railings were installed on Wilford Toll Bridge, these could
become an entrapment. All drivers are trained in defensive driving,
drive at no more than 10 k/h over the bridge and are prepared for
pedestrians and cyclists. A tram simulator has been developed which
trains drivers for adverse weather conditions and
emergencies; (i) Certain areas of the tram route are prioritised in terms of monitoring. Chilwell Road in particular is being investigated as a problem area as accidents have occurred there.
RESOLVED to
(1)
note the report; (2)
approach St Patrick’s Primary School with a view
to visiting the school; (3)
prepare a report for the next Committee meeting on the
implementation of safety measures at Chilwell Road, and the possibility of rubber
infills for the tracks here; (4) continue to monitor Wilford Toll Bridge and Chilwell Road. |
|
Apologies for Absence Minutes: Councillor Alex Ball Councillor Kevin Greaves Steve Lowe (Tramlink Nottingham Ltd) |
|
Declarations of Interest Minutes: None. |
|
Minutes of the last meeting PDF 176 KB Minutes of the meeting held on 15 September 2015, for confirmation. Minutes: Councillor Richard Jackson was not marked as present on the minutes of the meeting dated 15 September 2015. Subject to this being amended, the minutes were agreed as a correct record and signed by the Chair.
The lift at the QMC tramstop is still not working properly and this continues to be a concern.
A report on the usage of bicycles on the Edinburgh tram system will still be brought to a future meeting. |
|
NET - Operational performance and progress update PDF 21 KB Report of the Head of Operations, Nottingham Trams Ltd Minutes: Mike Mabey, from Nottingham Trams Ltd, presented the report updating the Committee on the performance of NET from September to December 2015. Mike highlighted the following:
(a)
punctuality dropped to 94.4% when the
new routes opened. This was due to drivers and controllers still
gaining experience on the new routes, as well as the public still
gaining confidence in using the new trams. Punctuality is now
improving; (b)
there have been six vehicle incursions
onto Lenton Lane bridge since the
commencement of new services. This has shown an improvement over
recent weeks but is still happening occasionally; (c)
there are still some issues with power outages causing disruption
to services but these are fewer; (d)
patronage levels since the new routes
opened are encouraging, particularly on the Toton Lane route, with
numbers on the Clifton route now improving;| (e)
the new ‘Robin Hood Card’
was introduced on 14th December and there have already
been over 10,000 sales. The card offers daily capping offering
value for money; (f)
the Christmas campaign was successful,
and travel officers were employed on tram stops to aid new users.
Additional trams were operated for goose fair and the fireworks on
5 November; (g) Nottingham Express Transit was awarded two major awards at the 2015 Light Rail Awards, for Project of the Year and Team of the Year.
The following answers were given in response to questions from the Committee:
(h)
patronage on the new lines is still
rising. Advertising campaigns have been successful in increasing
user numbers and. Clifton park and ride is increasing in
popularity; (i)
residents of Fletcher Road and Lower
Road in Beeston requested that newer trams be used for late
services on New Year’s Eve as they are quieter. This request
was passed to the operators; (j)
it is disappointing that the footbridge
access from the QMC tram stop into the hospital and treatment
centre is still not open. The hospital is looking to change its
interior layout to allow this; (k)
Robin Hood Cards are currently unavailable from the ticket machines
at tram stops. Retrofitting these machines is being looked at as a
possibility. Weekly and monthly capping on the cards is planned for
the future; One Committee member asked if a leaflet was ever produced to encourage visitors to Hucknall as discussed in a previous meeting. As there was no representative from Tramlink present no answer could be provided but they will be asked after the meeting.
RESOLVED to note the report |
|
Letters from members of the public PDF 381 KB Minutes: Andy Holdstock, Senior Project Engineer, NET, presented a letter from a member of the public and sought the views of the committee. Andy highlighted the following:
(a)
the correspondent considers there to be insufficient signage at tram
stops to inform customers that they need to validate their
concessionary pass before boarding the tram. He also considers that
it is not made clear that concessionary cards cannot be validated
at ticket machines; (b)
the positioning and size of signage has met the approval of the
Independent Appeals Panel and magistrates; (c)
when the new routes first opened there were travel officers located
at tram stops to help new users to use the tram
correctly; (d) advisory leaflets are sent out with all new concessionary passes with instructions on how to validate them at tram stops;
The following responses were given in answer to questions from the Committee:
(e)
only concessionary passes from Nottingham City and Nottinghamshire
councils are valid on trams; (f)
concessionary passholders who fail to
validate their passes before boarding trams will not be penalised,
but told that they should validate their pass the next
time; (g)
there is an estimated fare evasion
figure of 1%, with 121 fines given in the past week. Inspectors are
visible on the trams to reduce the number of people trying to ride
a tram without a valid ticket. There is an appeal process for
passengers who have been fined; (h) when ticket machines were introduced there was an increase in revenue, demonstrating that they are more reliable that on-board conductors in reducing fare evasion.
RESOLVED to
(1)
note the correspondence, issues arising and response by
NET; (2) offer no objection to the response already made. |