29 Pupil Growth Contingency Fund - criteria setting PDF 373 KB
Report of the Director of Education and the Corporate Director for Children and Adults
Additional documents:
Minutes:
Lucy Juby, Project Manager, School Organisation, introduced the report updating the Forum on the Sub-Group’s recommendations for the principles and criteria under which funding can be allocated to maintained schools and academies in 2018/19:
(a)
the representative Sub-Group was established to undertake a review
of both the existing Pupil Growth Contingency Funding (PGCF) model
for primary schools and the required model for secondary school
pupil growth;
(b)
significant pupil growth due to a growth in birth rate and new
arrivals in the city is now impacting on the secondary sector so an
appropriate funding model is required to support
expansion;
(c)
the criteria for the PGCF in the primary
sector was also reviewed by the Sub-Group. This has largely
remained the same except that funding for any utilities and
teaching assistants will be allocated based on a case by case
basis, rather than assumed to be required;
(d)
the primary expansion programme is now largely complete, with the
majority of applicants receiving an offer at their first or second
preference school at first admission;
(e)
for secondary expansions, funding will be allocated to schools who
are increasing their intake by a minimum of one full class, and
where growth is in agreement with the School Organisation
Team;
(f)
for each additional class, one teacher
will be funded along with deprivation funding based on the
school’s proportion of pupils eligible for the Free School
Meals, FSM6 and IDACI band factors. Classroom setup costs may be
funded dependent on individual circumstances. If there is already
existing resourced space or surplus capacity at the school it will
not be funded. If a school takes more than one additional class
this will be funded on a sliding scale;
(g) from April 2018, any academy that chooses to reduce its admission number against the wishes of the Local Authority will not receive PGCF for any subsequent increases;
The following points were raised during the
discussion which followed:
(h)
good and outstanding schools will be prioritised for expansions to
ensure quality of provision;
(i)
capacity at primary schools will
continue to be monitored although the main expansion programme is
now largely complete with the final two permanent expansions
underway. Schools will be approached individually if there is
pressure in future;
(j)
distances that pupils will need to
travel to school will be taken into account when expanding schools,
with the aim to be providing places in suitable locations. Changes
of catchment areas has been considered but this is more complex
with secondary schools as their admissions criteria varies and some
do not have catchment areas;
(k) a number of schools and academies have already come forward with interest in expanding, including Fernwood School which has been successful in its funding bid from the Education Funding Agency, pending consultation.
RESOLVED to
(1)
approve the proposed conditions, criteria and
methodology under which funding can be allocated to secondary
schools during 2018/19 as recommended by the Schools Forum
Sub-Group and detailed in Appendix 1 of the report;
(2) approve ... view the full minutes text for item 29